“Due to heavy rainfall and excessive soil moisture, the
Ministry of Agriculture (MOA) has extended the mandatory grazing and mowing
deadline for meadows by two weeks – until September 15, the ministry announced
on Thursday.
Usually, meadows and other areas specified in the
requirements must be mowed or grazed at least once by September 1.
According to the ministry, the deadline has been extended
because, due to recent rainfall, heavy machinery cannot enter the fields
everywhere, and the cut grass dries more slowly.
“We understand perfectly well that nature dictates its own
conditions, and farmers are currently facing serious challenges. By granting an
additional two weeks, we are reducing the administrative burden and enabling
farmers to complete their work in a quality manner,” Agriculture Minister
Kęstutis Mažeika said in a statement.
According to the Ministry of Agriculture, the extended
deadline applies to applications submitted in 2026, maintaining meadows and
herbaceous nitrogen-fixing plants on arable land and fulfilling the obligations
of some ecological systems.
This will include the obligations of such ecological systems
as: “Management of orchards and berry bushes in a nature-friendly manner”,
“Maintenance of landscape elements”, “Replacement of arable peatlands with
meadows”, “Replacement of eroded land with meadows”, “Integrated scheme for the
maintenance of meadows and wetlands” and “Replacement of arable land with
meadows, their maintenance and care”.
Until September 15, it will also be possible to mow
landscape elements - clearings, boundary strips, banks of water bodies, ditches
and areas under individual trees and shrubs.”
Komentarų nėra:
Rašyti komentarą